STANDARD OPERATION PROCEDURE

  • First ram bottom side, bolster plate top side should be cleaned.
  • The flywheel of ram and die kushion pin is adjusted to fit comfortably with the tool.
  • First top side of the bolt should be tightened.
  • Then the screw rod is adjusted with the tool.
  • Knockout rod and die kushion pin is adjusted to fit comfortably with the tool.
  • Atlast, top side and bottom side bolt is tightened after checking the bolsterslot,ram slot, and tool slot are arranged properly.