DRILLING MACHINE

  • First the job work is given by the production supervisor
  • After the job has been given to the worker, the worker should buy the gauge from the quality control.
  • When the job is started first two pieces is given to the quality control and inspected.
  • If the inspection is not ok, then the production will be start after the dimension of the work pieces is corrected.
  • Rejection pieces should be given to the quality control and it should be kept in the rejection box.
  • Three pieces are given to the quality control and inspected when the shift closing time
  • The worker should give the gauge at store after shift closes.
  • Machines and its surroundings should be kept clean by the worker.