STANDARD OPERATION PROCEDURE

  • First ram bottom side, bolster plate top side should be cleaned.
  • The flywheel of ram and die kushion pin is adjusted to fit comfortably with the tool.
  • First top side of the bolt should be tightened.
  • Then the screw rod is adjusted with the tool.
  • Knockout rod and die kushion pin is adjusted to fit comfortably with the tool.
  • Atlast, top side and bottom side bolt is tightened after checking the bolsterslot,ram slot, and tool slot are arranged properly.
  • Then the tool should be cleaned and inserted.
  • The locknut of the ram is tightened.
  • Then the bottom side bolt should be tightened.
  • Then the screw rod is tightened.
  • After setting, first five work pieces are inspected. If the inspection is not ok then resetting will be done
  • Machine bed is cleaned when the shift is going o be closed.